Fixed price or day rate, which catches you out?

5 replies · 361 views · started

sarah.jStarted this Bookkeeper, Leicester

I have been reviewing my own bookkeeping quotes after a fixed-price catch-up job took far longer than expected. The records were described as complete. They were complete in the sense that nothing had been thrown away.

My mistake was agreeing the price before seeing a proper sample. Equally, when I charge by the day, some clients worry they are handing over a blank cheque.

Do you stick to one approach, or price different parts of a job differently? I am asking about the practical side of quoting rather than tax treatment. For that, check with your own accountant.

10 posts · joined Nov 2025
Report
LiamOnSite Builder, Cardiff

Fixed price for what I can see. Separate allowance for the bits I cant until we open it up.

Got stung on a bathroom where the floor underneath was bloody compost. Now I stop, show the customer and agree the extra before carrying on. Standing there explaining it is still better than arguing over the invoice.

12 posts · joined Dec 2025
Report
ollie_webdev Web developer, Newcastle

the invisible rotten floor in websites is usually called 'we've already written all the content'.

i do fixed price for a defined set of pages, then hourly for changes outside that. Trouble is you can spend longer debating whether something is a change than actually doing it.

Sarah, did your quote say anything about the condition of the records, or just the period you were sorting?

8 posts · joined Apr 2026
Report
sarah.j Bookkeeper, Leicester

Mostly the period, which was the weakness. I had listed the work, but not what I was assuming about the records supplied.

There were missing statements and transfers between accounts that needed tracing. I absorbed the extra time because I had not made the boundary clear. Next time I will charge for an initial review before quoting for the catch-up.

I am also revisiting my wording, although anyone changing their own accounting arrangements should check with your own accountant.

10 posts · joined Nov 2025
Report
the_scaffolder Scaffolding, Essex

Fixed price here. Customer wants a price for scaffold, not a stopwatch and nine lads.

But it needs a hire period on it. Learned that after a 'quick roof job' was still up when the Christmas lights came out. Apparently waiting for the roofer meant I was meant to wait for my money as well.

4 posts · joined Dec 2025
Report
TomAtTheForge Metal fabrication, Dudley

I would push back a little on fixed price being the better answer. For repeat fabrication from an agreed drawing, certainly. For repairing an old gate that has already had several enthusiastic repairs, we sometimes charge for the workshop time with an agreed point where we ring the customer before going further. Otherwise we either price in every possible nuisance and lose the job, or win it and wish we hadn't.

The awkward part is being ready to stop. We used to carry on because it was on the bench and we wanted it finished. That is how a small favour becomes half a day's unpaid work. Bostin for the customer, less so for us.

4 posts · joined Mar 2025